Falling roof ice protection New canopy protects electrical service on building eave from roof ice and snow. Simple design offers protection and a clean look at an economical price.
Asides
CPR First Aid Training Complete
CPR First Aid Training was completed for 2015 last week at in Iron Mountain for General Contractor, Smith Metal Structures.
Roof ice damage
Have you inspected your roof for roof ice damage? The power of moving roof ice can cause damage to your roof and to any roof perforations that get in the way. A welcome break in the early winter weather gave our crews an opportunity to make repairs. Regular roof inspections will extend the life of…
Spring Overhead Door Inspection
Give your overhead doors a spring overhead door inspection after a long winter. Our 14 point tune-up will prevent costly repairs and keep your overhead doors operating smoothly. Smith Metal Structures Inc. is a Wayne Dalton commercial Overhead door dealer.
steel wall panels complete
New steel wall panels installed provide bright new workspace. Work completed in two days by Smith Metal Structures of Iron Mountain. Smith Metal Structures, Inc. is an authorized Star Building dealer
New steel roof completed
Steel roof work has recently been completed in Iron Mountain, MI. The existing roof and insulation have been replaced after 38 years of service. The added insulation will help with always rising energy costs and the new trim and soffits has given the building a “new look” The 4000 sf of steel roof work was…
CAN YOU RECOGNIZE A METAL BUILDING FROM THE OUTSIDE? THING AGAIN.
metal building, upper peninsula, iron mountain
Service Door Work
The service door work will include the replacement of two doors complete with new hardware in this existing metal building located in Kingsford, MI. The new doors will be painted with a finish coat over the factory primer. New weatherstripping, threshold and sweep will make the door weather tight and complete the installation. If your…
Muddy conditions
Muddy conditions did not stop our crews from having a productive week. Successful building sets were completed on schedule in three states for Systems Control of Iron Mountain, MI. Careful planning and detailed execution kept muddy conditions from hampering progress of the trucks, cranes and crews. Great Work!
Construction Work complete
Construction work complete. Crew, truck, and all equipment back safe and sound. All equipment will be cleaned, checked and made ready for use on future construction work.